Resin materials | Application steps |
---|---|
Qu resin / Qu connector (QR) | - The surface was sandblasted with 110 μm aluminum oxide. - The surface has been cleaned with oil-free compressed air. - Qu-connector implemented. Irradiated for 90 s. - Qu-resin was injected. - The polymerization time of the material is approx. 5 min. |
Quick Up / Quick up adhesive (QP) | - Quick up adhesive was applied using an applicator. - Adhesive was air dried for 30 s. - Quick up was injected. - The polymerization time of the material is approx. 2 min. |
Ufi Gel Hard / Ufi Gel Hard Adhesive (UGH) | - Conditioner was applied and left to dry for 30 s. - Ufi Gel hard powder/liquid was mixed homogeneously in a 3/1 ratio. - The polymerization time of the material is 7–8 min. |
Pattern Resin LS Powder / Liquid (PR) | - The brush was wetted with the liquid and the powder was picked up, according to the manufacturer instruction. The gap was built up, layer by layer. - The working time of the material is 2–3 min. - The hardening time of the material is 4 min. |
Futura Basic Hot Powder / Liquid (FBH) | - The mixing ratio of Futura Basic Hot is approximately 2.5 parts powder to 1 part liquid by weight. - After the powder of the material was added to the liquid, it was mixed for 30 s until a homogeneous mixture was obtained. - It was cooked in a pressure cooker at 95 degrees and 2–4 bar pressure for 20 min. |