Skip to main content

Table 2 Resin materials used in the study and application steps

From: Investigation of the effects of different denture base fabrication techniques and hard relining resin materials on the fixation of immediate provisional hybrid prosthesis to titanium cylinders

Resin materials

Application steps

Qu resin / Qu connector (QR)

- The surface was sandblasted with 110 μm aluminum oxide.

- The surface has been cleaned with oil-free compressed air.

- Qu-connector implemented. Irradiated for 90 s.

- Qu-resin was injected.

- The polymerization time of the material is approx. 5 min.

Quick Up / Quick up adhesive (QP)

- Quick up adhesive was applied using an applicator.

- Adhesive was air dried for 30 s.

- Quick up was injected.

- The polymerization time of the material is approx. 2 min.

Ufi Gel Hard / Ufi Gel Hard Adhesive (UGH)

- Conditioner was applied and left to dry for 30 s.

- Ufi Gel hard powder/liquid was mixed homogeneously in a 3/1 ratio.

- The polymerization time of the material is 7–8 min.

Pattern Resin LS Powder / Liquid (PR)

- The brush was wetted with the liquid and the powder was picked up, according to the manufacturer instruction. The gap was built up, layer by layer.

- The working time of the material is 2–3 min.

- The hardening time of the material is 4 min.

Futura Basic Hot Powder / Liquid (FBH)

- The mixing ratio of Futura Basic Hot is approximately 2.5 parts powder to 1 part liquid by weight.

- After the powder of the material was added to the liquid, it was mixed for 30 s until a homogeneous mixture was obtained.

- It was cooked in a pressure cooker at 95 degrees and 2–4 bar pressure for 20 min.